A walkthrough is an hour on your layout — towers or villas, how the gate actually works, who will sign in as owner admin. We will not spend it on a generic slide about visitor management.
What we will open
- The property tree: a block that matches the building, units you can preview before they are written.
- A shift and the roster, so attendance is not a punch looking for a story.
- The gate flow: a pass against a unit, and the staff profile that admitted them.
- Where residents will sign in, once the unit list is honest.
Who should be in the room
Someone who can become owner admin — usually a committee member or the person who already runs the desk. If the gate supervisor can join for the last twenty minutes, the pass makes more sense than a screenshot.
Bring:
- The society registration number, if you have it.
- A rough unit count (less than 50, 50–100, or larger).
- Whether you sit on the committee, at the desk, or at the gate.
- Anything true about the layout: mixed towers and villas, a second boom, a gate on a private network.
After you send the form
We reply from the same inbox as Contact us. You will get a time, not a brochure that lists billing we have not built. If the society is not a fit, we will say so — a two-day install that skips the unit list is not something we sell.
